ERECTION OF STEEL BUILDINGS
US BUILDINGS erection team is comprises of highly qualified and well trained site engineers and safety officers. The team has completed more than 50 projects in VIET NAM, CAMBODIA, THAILAND, MYANMAR & SOUTH EAST ASIA.
PROJECT MANAGER is dedicated to ensure the coordination of all site activities and with other departments of US BUILDINGS
PREPARATION WORK :

SETTING ANCHOR BOLTS :
BEFORE CASTING CONCRETE
|
AFTER CASTING CONCRETE
|
BEFORE
|
AFTER
|
UNLOADING MATERIALS :
DELIVER TO SITE & UNLOADING
|
UNLOADING RAFTER
|
UNLOADING COLLUMNS
|
ASSEMBLING MEMBERS :
ASSEMBLING COLLUMNS
|
|
|
TIGHTENING BOLTS
|
SAFETY WORKS :
EVERY ONE IN ERECTION TEAM MUST BE TRAINED ABOUT SAFE
|
|
|
INSTRUCTION TO WORKERS BEFORE ASSEMBLING AND ERECTION
|
.jpg)
SAFETY WIRE INSTALLED
ALL WORKERS WHO WERE WORKING ON HIGH PLACE MUST HOOK THEIR SAFETY BELTS TO " THE SAVE LIFE WIRE" TO PREVENT THE FALLING THREATS
.jpg)
AMBULANCE IS ALWAYS READY IN CASE ACCIDENTS OCCUR
ERECTION :


.jpg)
INSPECTION AFTER FINISHING MAINFRAME :
.jpg)
MAIN FRAME DONE
INSPECTION MATERIALS AT FACTORY
|
VERTICAL AND HORIZONTAL DEFLECTION CHECKING AFTER MAINFRAME DONE
|