US Buildings Warehouse designs and builds high steel bays, as well as standard and support storage. In addition to large span, mono slope, and multi-span warehouses. We provide roller doors, electromechanical hangar doors, ventilators, windows, and many other accessories needed for warehouse buildings: insulation, cladding, portals, and overhead cranes. Universal Vietnam Steel Buildings has excellent experience in designing and constructing storm and seismic structures in the world's more volatile climates.

Overview
This prefabricated storage project was manufactured in Vietnam and constructed in Cambodia. It was meant to store commodities that can be delivered internationally. As a result, the Metal Warehouse Building's owners and site managers have requested that the warehouses in this prefabricated structure be equipped with cranes and product loading docks.

View From A Far
Our engineering team and designers begin working on designs and estimating supplies for customers as a crane and load bay become necessary. Consider aspects like ground stability, humidity, rain level, maximum load, and road layout; all of these things have a role in determining the pricing and estimated material requirements for a prefabricated warehouse. In this scenario, we supply customers with a 30-ton crane, a common area with lockers and restrooms, and a loading bay large enough for two vehicles and small rails. Due to the restricted space, the guard is shifted to another floor of the steel-framed warehouse, which requires the installation of stairs.
Customers will be delivered with the fundamentals of each pre-engineered warehouse project: central plates, roofing, wall panels, ventilation systems, doors, and window frames. Because the project location is relatively dry and rain-free, our product will be the best suit for you; nonetheless, a portion structure requires fire-resistant epoxy paint. Each element is prefabricated at the factory by utilizing the textures provided by the detailed design team.

Clear Spans Installation
Because we recognize that cost is the most important consideration for this metal warehouse construction project, we make it the top priority of the design of a material structure and maximum optimization design without sacrificing too much quality.
The prefab warehouse project takes approximately 4 weeks to erect; We install the anchor on the concrete floor, and then site managers travel from area to area instructing engineers to assemble structures using erection blueprints. Customers are notified after each progressive stage during this time, and any issues are instantly reported on Email, WhatsApp, or elective applications. Finally, the project manager goes over a post-control checklist to make sure everything is in order and set up properly. The QC report is then provided back to the customer to double-check. The two parties will make a handover record only after the customer is satisfied with the project. We always put the customer's happiness first on each project, because our motto "Durable Like Steel" refers not only to the quality of the product we strive for but also to the relationship between you and us.
With a highly experienced and devoted workforce, Universal Vietnam Steel Buildings aims to supply you with the best goods and services through value engineering, advantageous costs, and payment options.
-----------------------------------------------------------
At Universal Vietnam Steel Buildings, we aim to give you the best product and services through value engineering, beneficial costs, and payment plans with a highly trained and committed team.
Check out our information on Dun & Bradstreet or Yellow Pages.
To find out more about how you can start your project today, contact us through our Online Form System or call/text +84 981 973 499 on WhatsApp.